| Factory Production Schedule Form |
| This form calculates the time needed to complete production: |
| |
| Specs: |
Name of Items: i.e. products, widgets, locations, etc. | | |
| Number of Items to Produce: | | |
| Employees Available To Work: | | |
| Average Width and Height |
|
| Avg. Width (inches) Each: | | inches |
|
| Avg. Height (inches) Each: | | inches |
|
OR |
Average Area |
|
| Avg. Area (inches) Each: | | squaresq. inchesin. |
| | | |
| Welding Needed: | | |
| Days of Travel: | | |
| One-way Miles Daily: | | |
| |
| Results Needed: Days Required to Perform Listed Work |
| |
| |
| |