Factory Production Schedule Form |
This form calculates the time needed to complete production: |
|
Specs: |
Name of Items: i.e. products, widgets, locations, etc. | | |
Number of Items to Produce: | | |
Employees Available To Work: | | |
Average Width and Height |
|
Avg. Width (inches) Each: | | inches |
|
Avg. Height (inches) Each: | | inches |
|
OR |
Average Area |
|
Avg. Area (inches) Each: | | squaresq. inchesin. |
| | |
Welding Needed: | | |
Days of Travel: | | |
One-way Miles Daily: | | |
|
Results Needed: Days Required to Perform Listed Work |
|
|
|